Operator's World:
Spotlight on a process
Use
case 6: Base Station Provisioning
Objective:
- Create provisioning plan for a BS (Base Station)
- Create all circuits between BS and BSC (transmission and O&M)
- Generate graphical report (Visio) describing the changes to
the network
Pre-Requisites:
- Base station is already planned with physical connectivity (trunks)
- BS and BSC ends known by the planner (provided by the provisioning
request input)
Process:
Result:
Reports showing the results can be either graphical (eg. MS Visio)
or Textual (Spreadsheet)
Next Step: RNC
Area Parameter Generation...
Other Implementations:
- Node B to RNC planning
- RNC to RNC planning
- BSC/RNC to MSC planning
The drawings are auto-updated from the latest data by x:akta
every time the report is generated.
This example is part of a continuing series showing how x:akta
improves standard tasks that are critical to efficient network operation.